Project: Abuja Rail Mass Transit Project Lots 1 & 3
Client: The Presidency/Presidential Projects Assessment Committee (PPAC)
The Project:
The construction of the fixed infrastructure of Lots 1 & 3 was awarded to the CCECC Nig Ltd for the design and build (D&B) of 60.76km of standard gauge railway tracks, station and depot buildings, bridges, culverts, signaling and communications system, automatic fare collection system, buildings, and fire automation systems, power supply and an extended maintenance for 5 years post-completion. The contract sum was $841.65m and the contract period was 4 years
Our role as Technical Advisors:
To conduct a strategic review and to develop a strategy for the completion of the project.